Shed permit rules by county
The square-foot line, and the places that still want a permit for a tiny shed. Cities are in the list too. A city rule is not the county rule, even when the city sits inside that county. Open a row for the quote and the link.
Arizona
- City of PhoenixIt depends
A one-story detached shed, playhouse, or similar building does not need a building permit when the total floor area is not over 200 square feet. Phoenix also names ramadas and gazebos as similar. If you run utilities to that shed, the utilities need a permit even when the building does not. Over 200 square feet, the residential page says the detached structure needs a permit.
California
- City of BerkeleyIt depends
A one-story detached tool or storage shed, or a playhouse, does not need a building permit if the floor area is not over 120 square feet. The page does not print a setback distance. Bigger than 120 square feet, it is not on the exempt list, and Berkeley says to assume you need a permit.
Florida
- Marion CountyNot published
The county permit page does not say how big a shed can be before a permit is required. It says Building Safety enforces the Florida Building Code, 8th edition. Ocala, the city in the middle of the county, has its own shed answer. This page does not copy it over.
- Miami-Dade CountyYes
Putting up a shed needs a permit. The county lists sheds with the structural work that still needs a permit even when the job is under $7,500. It does not publish a square-foot size that is exempt. Taking a storage shed down is different: removal with no electrical or plumbing is on an exempt list, inside a $5,000 cap for that whole list over 12 months.
- City of OcalaYes
Yes for a normal shed. The city says most accessory structures need a building permit, and it names new sheds, replacement sheds, and site-built sheds. It does not publish a square-foot size that is exempt. You will be asked for product approval or engineered plans, and the shed has to meet zoning setbacks. If the shed, installation included, is worth more than $5,000, you also record a Notice of Commencement before work starts.
- Orange CountyYes
Yes. Every shed needs a permit. The short guide says a structure of 120 square feet or less may sit outside the building code and you still apply. The accessory-structure page is sharper: a footprint of 120 square feet or less is a zoning permit, and Building Department code review and engineered plans are not required. Larger than that, you are in the full plan submittal. No height cutoff is printed.
- City of TampaIt depends
A one-story detached shed used as a tool or storage building, or a playhouse, does not need a permit if the floor area is not over 120 square feet. You still have to keep the setbacks. The FAQ does not print the setback distance. Over 120 square feet, that exemption stops. The city does not add a second sentence that says 'and therefore the bigger shed needs a permit,' but you are off the list they published.
Nevada
- City of Las VegasIt depends
A shed of 200 square feet or larger needs a permit, including when you build it, demolish it, or move it. A non-habitable one-story detached storage building or playhouse at or under 200 square feet does not, if you are not adding electrical, plumbing, or mechanical work. Zoning still applies. Planning is (702) 229-6301.