Do I need a shed permit in Berkeley, California?
It depends.
A one-story detached tool or storage shed, or a playhouse, does not need a building permit if the floor area is not over 120 square feet. The page does not print a setback distance. Bigger than 120 square feet, it is not on the exempt list, and Berkeley says to assume you need a permit.
Rules change, and a handout can be older than the code book. This page was checked on November 19, 2026. Confirm it with the local building department before you buy materials or hire someone.
City of Berkeley. If a job is not on the city's exempt list, the city says to assume you need a permit. Zoning can still apply when a building permit does not.
Cutoffs they actually printed
Floor area
120 square feet
A one-story detached tool shed, storage shed, playhouse, or similar use at or under this area does not need a building permit.
What the page says
A one-story detached tool or storage shed, playhouse, or similar use does not need a building permit when the floor area is not greater than 120 square feet.
One story detached accessory structures used as tool and storage sheds, playhouses and similar uses, provided the floor area is not greater than 120 square feet.
City of Berkeley, Work Exempt from Building Permits · checked November 19, 2026
If the work is not on the exempt list, Berkeley says to assume you need a permit from the Permit Service Center.
If the work you are planning to do is not on the list below, you should assume that you will need a permit from the Permit Service Center.
City of Berkeley, Work Exempt from Building Permits · checked November 19, 2026
A zoning permit can still be required when a building permit is not.
A zoning permit may be required, even if a building permit is not.
City of Berkeley, Work Exempt from Building Permits · checked November 19, 2026
Fee
No fee for this job was printed on the page we checked.
The exempt-work page does not print a dollar fee. The Permit Service Center phone is (510) 981-7500.
Who to call
City of Berkeley Permit Service Center
Also in Berkeley
- Deck · It depends
- Fence · It depends
- Water heater · Yes
Nearby, same question
No neighboring jurisdiction is written up beside this one.
Shed permit rules by county also covers Phoenix, Marion County, Miami-Dade County, Ocala, Orange County, Tampa, Las Vegas.
Questions this page answers
- Do I need a shed permit in Berkeley, California?
- A one-story detached tool or storage shed, or a playhouse, does not need a building permit if the floor area is not over 120 square feet. The page does not print a setback distance. Bigger than 120 square feet, it is not on the exempt list, and Berkeley says to assume you need a permit.
- Is there a size or height cutoff in Berkeley?
- Floor area: 120 square feet. A one-story detached tool shed, storage shed, playhouse, or similar use at or under this area does not need a building permit.
- How much is the permit fee in Berkeley?
- The exempt-work page does not print a dollar fee. The Permit Service Center phone is (510) 981-7500.
- Who do I call to confirm the shed rule?
- City of Berkeley Permit Service Center. Phone (510) 981-7500. Email permits@berkeleyca.gov. Rules on this stuff change. Confirm it with them before you buy materials or hire someone.