Check a Permit

checkapermit.com · the local rule, with the page it came from.

County · checked November 19, 2026

Do I need a shed permit in Orange County, Florida?

Yes. You need a permit.

Yes. You need a permit.

Yes. Every shed needs a permit. The short guide says a structure of 120 square feet or less may sit outside the building code and you still apply. The accessory-structure page is sharper: a footprint of 120 square feet or less is a zoning permit, and Building Department code review and engineered plans are not required. Larger than that, you are in the full plan submittal. No height cutoff is printed.

Rules change, and a handout can be older than the code book. This page was checked on November 19, 2026. Confirm it with the local building department before you buy materials or hire someone.

Unincorporated Orange County. The county says its guide is not a complete list. It also names extra steps for the City of Edgewood and the Ranger Drainage District.

Cutoffs they actually printed

What the page says

Fee

No fee for this job was printed on the page we checked.

The accessory-structure page explains which permit you need and does not print a dollar fee.

Fee source

Who to call

Orange County Division of Building Safety

201 South Rosalind Avenue, 1st Floor, Orlando, FL 32802

Also in Orange County

Nearby, same question

No neighboring jurisdiction is written up beside this one.

Shed permit rules by county also covers Phoenix, Berkeley, Marion County, Miami-Dade County, Ocala, Tampa, Las Vegas.

Questions this page answers

Do I need a shed permit in Orange County, Florida?
Yes. Every shed needs a permit. The short guide says a structure of 120 square feet or less may sit outside the building code and you still apply. The accessory-structure page is sharper: a footprint of 120 square feet or less is a zoning permit, and Building Department code review and engineered plans are not required. Larger than that, you are in the full plan submittal. No height cutoff is printed.
Is there a size or height cutoff in Orange County?
Footprint: 120 square feet. At or under this footprint the shed is a zoning permit. Building Department code review and engineered plans are not required. It is still a permit.
How much is the permit fee in Orange County?
The accessory-structure page explains which permit you need and does not print a dollar fee.
Who do I call to confirm the shed rule?
Orange County Division of Building Safety. Phone (407) 836-5550. Email PermittingServices@ocfl.net. Rules on this stuff change. Confirm it with them before you buy materials or hire someone.