Do I need a deck permit in Phoenix, Arizona?
It depends.
An open deck can skip the permit when it is not more than 30 inches above grade, not over a basement or story below, and not part of an accessible route. The handout says decks and sport courts with no roof are in that exception. A patio cover is a different project. The residential page lists patio covers with the work that needs a permit.
Rules change, and a handout can be older than the code book. This page was checked on November 19, 2026. Confirm it with the local building department before you buy materials or hire someone.
City of Phoenix. These notes come from the residential projects page and the city's work-exempt handout. They are not a rule for the rest of Maricopa County.
Cutoffs they actually printed
Height above grade
30 inches
Platforms, and the city's commentary includes unroofed decks, at or under this height can be exempt if they are not over a basement and not part of an accessible route.
What the page says
Platforms not more than 30 inches above grade, not over a basement or story below, and not part of an accessible route, do not need a permit.
Platforms, sidewalks and driveways not more than 30 inches (762 mm) above grade and not over any basement or story below and which are not part of an accessible route.
Phoenix Building Construction Code, work exempt from a permit · checked November 19, 2026
The commentary pulls unroofed decks and sport courts into that platform exception.
Decks, sport courts and other similar uses with no roof covering shall also be included in this exception.
Phoenix Building Construction Code, deck commentary · checked November 19, 2026
Patio covers are on the residential list of projects that require a permit, so a roof over the deck is not the open-deck exemption.
Porch and carport enclosures. Patio covers. Room additions.
City of Phoenix, Residential Projects · checked November 19, 2026
Fee
No fee for this job was printed on the page we checked.
The work-exempt handout and the residential projects page do not print a dollar fee for this job.
Who to call
City of Phoenix Planning and Development, Residential Building
Also in Phoenix
- Fence · It depends
- Shed · It depends
- Water heater · It depends
Nearby, same question
No neighboring jurisdiction is written up beside this one.
Deck permit rules by county also covers Berkeley, Marion County, Miami-Dade County, Ocala, Orange County, Tampa, Las Vegas.
Questions this page answers
- Do I need a deck permit in Phoenix, Arizona?
- An open deck can skip the permit when it is not more than 30 inches above grade, not over a basement or story below, and not part of an accessible route. The handout says decks and sport courts with no roof are in that exception. A patio cover is a different project. The residential page lists patio covers with the work that needs a permit.
- Is there a size or height cutoff in Phoenix?
- Height above grade: 30 inches. Platforms, and the city's commentary includes unroofed decks, at or under this height can be exempt if they are not over a basement and not part of an accessible route.
- How much is the permit fee in Phoenix?
- The work-exempt handout and the residential projects page do not print a dollar fee for this job.
- Who do I call to confirm the deck rule?
- City of Phoenix Planning and Development, Residential Building. Phone (602) 261-8078. Email residential.building@phoenix.gov. Rules on this stuff change. Confirm it with them before you buy materials or hire someone.